Search This Blog

Posted by : Saurabh Gupta Friday, February 14, 2014


ROLL BACK TO SAMVID 2013
College covered – 30
Total number of group -170
Total number of participant – 7

BRIDGE IT  is an event that brings together hundreds of engineering students from varied streams to participate in a full-day celebration. Young minds are challenged to design and build a Popsicle stick bridge based upon given rules. Students submit their designed structure and then their strength are tested using standard loading machine or an equivalent.
The competition is a fun way for students to think critically, be innovative, learn to solve problems and to recognize the importance of higher education.
SELECTION CRITERIA
1. Objective type question paper (1 for each group) 15 questions. Questions will be completely logical and brain teasing. If you can really just wonder and feel the load, the way they acts on the bridge, here you are.
2. Bridge making
You have to make a bridge using Popsicle sticks, cobbler thread and adhesive.
The bridge constructed soon creatively, with maximum load bearing and lesser number of sticks may be the winner (plus OQP).
As time is sufficient with you, bridge with minimum sticks and maximum load will be the first preference.
The bridge with attractive design (look) may have bonus.
Though if there is quite significant difference in time of completion it will matter.
Sufficient time will be allowed for glue to freeze and stick properly.
Other directions will be given at the time accordingly.
Fees 200 INR/per group
Group - 2-4
Rules
Team may consist of maximum 4 and minimum 2 members.
Members may be from ANY BRANCH and ANY INSTITUTE.
Teams must bring their registration slip during event.
Team(s) may be disqualified in case of misconduct or unacceptable behavior.\
Dimensions of the bridge: length:  75cm-90cm, breadth:    10cm - 15cm,   However there
will be flexibility in   height of the bridge.
Popsicle stick(400), adhesive (fevicol), cobbler thread and paper pins could only be
used to make model provided by organizers.
No external material will be allowed to use. In case used or found using, team(s) will be
disqualified immediately.
Time limit would be 3 hours for model making and including objective question paper.
Loading- At the centre of the load bearing girder.
Models must be made within given time; no extra time will be given.
Event organizer will not be responsible in case of time clash with other event.
Any damage during construction or before evaluation, organizers will not be responsible
Decision of judges will be final and binding to all participants.
No team member will interfere in Judge’s decision.
In case of tie, models will be analyzed by judges and their decision will be final and
binding to all participants.
Rules may subjected to change according to circumstances.
Materials (to be provided)
Popsicle sticks (400)
Adhesive i.e. fevicol
Cobbler threads 1 m. in length.
Requirement common for whole would be 2 hexagonal blades, pencils, rubbers.

Leave a Reply

Subscribe to Posts | Subscribe to Comments

Telegram

Notes for M.Tech. CTM (Construction Technology Management) available strictly as per syllabus for all three-semester available. Features: • Notes from Gold Medalist student • Handwritten crisp to the point notes • Printed notes • Video notes of some subjects • Previous year question paper • Solved question paper • Subject/Unit wise arranged • Objective question paper for online exam M.Tech. complete thesis support also available. Join telegram group https://t.me/+cj3WhHbC86syMTdl Complete Mtech Thesis support available: 1) Synopsis 2) Synopsis PPT 3) Thesis 4) Thesis PPT 5) Conference paper These are included in the package Those who only want guidance, msg me for more information https://t.me/+cj3WhHbC86syMTdl
Related Posts Plugin for WordPress, Blogger...

Popular Post

Blogger templates


Blog Archive

Copyright @ NotesCivil 2013-2016. Powered by Blogger.

Total Pageviews

- Copyright © CIVIL Engineering STUDY Material , NOTES , Free Ebook