Search This Blog

Archive for 2014

[Pdf] [Ebook] RRB (Railway Recruitment Board) Civil Engineering SSE EXAM Model Paper

[Pdf] [Ebook] RRB (Railway Recruitment  Board) Civil Engineering SSE EXAM Model Paper 









INCOMING SEARCHES

rrb sse
rrb sse books
rrb sse exam pattern
rrb sse exam books
rrb je sse
rrb sse 2014
rrb sse book
rrb sse je
rrb je and sse
rrb sse study material
rrb sse apply online
rrb sse and je
rrb sse online application
sse rrb
sse in rrb
rrb sse syllabus
rrb sse exam syllabus
syllabus for rrb sse exam
rrb sse syllabus 2014
railway sse exam syllabus
rrb je sse syllabus
sse syllabus
sse railway syllabus
railway sse syllabus
syllabus for sse in railway
rrb sse previous papers
rrb sse exam papers
rrb sse previous year paper
rrb sse paper
rrb sse papers
rrb sse previous question papers

sse exam
rrb sse recruitment 2014
rrb sse recruitment
railway sse exam
sse railway exam
sse exam 2014
sse recruitment 2014
sse railway recruitment 2014
railway sse recruitment 2014
sse recruitment
sse in railway
sse recruitment in railway
railway sse recruitment
rrb exam syllabus
syllabus for rrb exam
rrb exams syllabus
syllabus of rrb exam
rrb secunderabad exam syllabus
rrb exam pattern and syllabus
rrb exam syllabus and pattern
rrb written exam syllabus
rrb recruitment 2014
rrb 2014 recruitment
rrb engineer recruitment 2014
rrb recruitment in 2014
rrb jr engineer recruitment 2014
www.rrb recruitment 2014
rrb recruitment exam
rrb engineer recruitment
rrb recruitment for engineers 2014
rrb recruitment for engineers
rrb recruitment exam 2014
rrb recruitment board
recruitment of rrb 2014
rrb engineers recruitment 2014
all rrb recruitment 2014
rrb exam books
rrb books
books for rrb exam
rrb exam reference books
books for rrb exam 2014
books for rrb
rrb exam questions
rrb exam question
rrb question
rrb questions
rrb question pattern
rrb exam question pattern
rrb model question
rrb question pattern 2014
rrb model questions
rrb questions 2014
rrb se exam date
rrb se exam papers
rrb je se syllabus
rrb se je
rrb je and se syllabus
rrb je se recruitment 2014
rrb se je syllabus
rrb je se syllabus 2014
rrb je se previous papers
rrb section engineer
rrb senior section engineer
rrb section engineer recruitment 2014
rrb section engineer books
rrb exam pattern for section engineer
rrb senior section engineer syllabus
rrb section engineer syllabus
rrb syllabus for section engineer
rrb section engineer 2014
rrb senior section engineer books
rrb exam books for section engineer
rrb senior section engineers vacancies 2014
rrb senior section engineer 2014
rrb books for section engineer
rrb section engineer recruitment
Tuesday, December 16, 2014
Posted by Saurabh Gupta

[PDF] RRB EXAM JE/SSE 2014 QUESTION PAPER FOR CIVIL ENGINEERING

RRB EXAM JE/SSE 2014  QUESTION PAPER

RRB EXAM PAPER2014 , 2013






INCOMING SEARCHES 
rrb je exam syllabus
rrb je exam
rrb je syllabus
rrb je exam 2014
rrb je exam pattern
rrb je recruitment 2014
rrb je syllabus 2014
rrb je recruitment
rrb je exam syllabus 2014
je rrb
rrb je exam pattern 2014
rrb je 2014 syllabus
syllabus of rrb je
rrb for je
rrb syllabus for je
rrb exam syllabus
syllabus for rrb exam
rrb exams syllabus
syllabus of rrb exam
rrb secunderabad exam syllabus
rrb exam pattern and syllabus
rrb exam syllabus and pattern
rrb written exam syllabus
rrb junior engineer syllabus
rrb junior engineer books
rrb junior engineer 2014
junior engineer rrb
rrb syllabus for junior engineer
syllabus for rrb junior engineer
rrb recruitment junior engineer 2014
junior engineer rrb recruitment 2014
rrb recruitment 2014 junior engineer
rrb chennai junior engineer recruitment 2014
rrb recruitment for junior engineer 2014
rrb junior engineer it syllabus
rrb exam syllabus 2014
rrb exam 2014 syllabus
syllabus for rrb exam 2014
rrb 2014 exam syllabus
syllabus of rrb exam 2014
rrb secunderabad exam syllabus 2014
rrb exam pattern and syllabus 2014
rrb syllabus for 2014
rrb recruitment 2014
rrb 2014 recruitment
rrb engineer recruitment 2014
rrb recruitment in 2014
rrb jr engineer recruitment 2014
www.rrb recruitment 2014
rrb recruitment exam
rrb engineer recruitment
rrb recruitment for engineers 2014
rrb recruitment for engineers
rrb recruitment exam 2014
rrb recruitment board
recruitment of rrb 2014
rrb engineers recruitment 2014
all rrb recruitment 2014
rrb exam books
rrb books
books for rrb exam
rrb exam reference books
books for rrb exam 2014
books for rrb
rrb exam questions
rrb exam question
rrb question
rrb questions
rrb question pattern
rrb exam question pattern
rrb model question
rrb question pattern 2014
rrb model questions
rrb questions 2014
rrb se exam date
rrb se exam papers
rrb je se syllabus
rrb se je
rrb je and se syllabus
rrb je se recruitment 2014
rrb se je syllabus
rrb je se syllabus 2014
rrb je se previous papers
rrb exam paper
rrb je exam paper
rrb exam paper for junior engineer
rrb exam model paper
rrb secunderabad exam papers
rrb exam paper pattern
rrb exam paper 2014
rrb paper
rrb je paper
rrb je exam question paper
rrb railway exam question paper
rrb junior engineer question paper
rrb paper pattern
rrb senior section engineer previous year papers

rrb model question paper for junior engineer





Monday, December 15, 2014
Posted by Saurabh Gupta

[PPT] [PDF] [NOTES] NON DESTRUCTIVE TESTING ON CIVIL ENGINEERING

 NON DESTRUCTIVE TESTING

   
 

                     
Non destructive test in CIVIL ENGINEERING Construction from Saurabh Gupta

After this seminar you will able to answer the following
üNon- destructive testing 
üRebound hammer testing
üUltrasonic pulse velocity test
üCover test
methods including principle, advantages and point of action
NDT (NON DESTRUCTIVE TESTING


NDT
1.Technique to test new or old concrete structure with respect to its strength and durability ,without or partial damage to a small part of concrete.
2.It doesn’t estimate ultimate or yield strength of concrete.
3.It is easy mechanized method, and is very cost effective , many test can be performed at the same cost of single destructive test.
4.No sample is required to collect for the laboratory testing as compare to some methods destructive testing
OUTPUT OF NDT 
 ELASTIC MODULUS
REINFORCEMENT LOCTAION
QUALITY OF WORKMANSHIP
CRACKS AND VOIDS
SURFACE HARDNESS
DENSITY
STRENGTH
SURFACE ABSORPTION
LIFE PERIOD

Sno.
TEST
1
Rebound Hammer Test
2
Windsore Probe Testing
3
Ultrasonic Pulse Velocity Test
4
Acoustic Emission Method
5
Pulse Echo Method
6
Initial Surface Absorption Test
7
Radar Technique
8
Infrared Thermography
9
Quantab Test
10
Carbonation test
11
Profometer / Rebar locator


NDT methods Commonly used
 REBOUND HAMMER TEST (IS 13311 II)
Determination of strength and hardness of concrete.

ULTRASONIC PULSE VELOCITY TEST (IS 13311 I)
To determine the homogeneity, compatibility  and cracks or void if present .

PROFOMETER / REBAR LOCATOR
Location of bar and diameter of bar

CARBONATION TEST
To estimate the amount of carbon and corrosion estimation.

REBOUND HAMMER TEST

To assess the likely compressive strength of concrete with help of with suitable co-relations
between rebound index and compressive strength.

To assess the uniformity of concrete.

To assess the quality of concrete in relation to standard requirements.

To assess the quality of one element of concrete in relation to another

This method  can be used with greater confidence for differentiating between the
questionable and acceptable part of a structure or for relative comparison between two
different structure.

When the plunger of rebound hammer is pressed against the surface of concrete, the spring
control mass rebounds and the extent of such rebound depend upon the surface hardness
of concrete, the rebound is thus related with compressive strength of concrete and the
graduated scale is designated as rebound number 

It Consists of spring controlled mass that slides on a plunger within a tubular housing.
The impact energy required for rebound hammer for different application is different .

Rebound hammer is used to check –
1 Compressive strength of concrete
2 Uniformity of concrete

3 Quality of element of concrete 

Limitation –
1 Accuracy ± 25%
2 Only suitable for closed textured conc.
3 Partially compacted concrete has no relation with rebound index
4 Result affected by angle of test, surface smoothness and mix proportion.  

AVG REBOUND NO.
QUALITY OF CONCRETE
>40
Very good hard layer
30-40
Good layer
20-30
Fair
<20
Poor concrete
0
Delaminated

Ultrasonic pulse velocity test
To assess the uniformity and homogeneity of concrete.
To assess the quality of concrete in relation of standard requirement.
Detection of presence of voids, cracks & imperfection of concrete.
Measurement of changes occurring with time in the properties of concrete.
To compare quality of two different concrete element.

Pulse velocity tests measure the transit time of an ultrasonic pulse between two transducers,
a transmitter and a receiver. The velocity of the pulse can be determined from the transit
time and the distance between the transmitter and the receiver. 

The pulse velocity measurement set consists of a pulse generator, a transmitter, a
receiver,an amplifier, a circuit that measures the elapsed time, a time display unit, and
connecting cables. Note that the pulse generator, receiver, amplifier, timing circuit, and time
display unit are all incorporated in the velocity meter shown in the schematic diagram of the
pulse velocity measurement set

There are three ways in which the transducers may be arranged, as shown in Figure :
(a) direct transmission through opposite faces
(b) semi-direct transmission through adjacent faces
(c) indirect transmission at the same face.


Factor affecting test results
•Smoothness of contact surface under test
•Influence of path line of pulse velocity
•Temperature of concrete
•Moisture content of concrete
•Presence of reinforcement steel
Stress level in concrete


 Profometer / REBAR LOCATOR 

•To determine
1.Diameter of reinforcement
2.Location of R/F
3.Cover 


The instrument is based upon measurement of change of an electromagnetic field caused
by steel embedded in the concrete.

Adequate cover to reinforcement is required in any reinforced concrete structure to prevent corrosion and to improve durability of structure. To calculate actual strength of concrete structures, the number of reinforcing bars, their condition of corrosion, cover to reinforcement, and grade of concrete is required. In the case of old structures, when the detailed drawings are not available, it becomes very difficult to compute the strength of the structure which is required for the strengthening scheme of the structure. Sometimes, the strength of concrete structures are to be checked to permit higher load and in absence of reinforcement details it becomes very difficult to take a decision.
To overcome all these problems, the methods have been developed for investigation and
evaluation of concrete structures. Profometer is a small versatile instrument for detecting
location, size of reinforcement and concrete cover. This instrument is also known as rebar
locator. This is a portable and handy instrument which is normally used to locate the
reinforcement on LCD display. This instrument is available with sufficient memory to store
measured data. Integrated software is loaded in the equipment for carrying out and printing
statistical values.
The equipment is quite handy and weighing less than two kgs. It works on normal batteries
and thus does not require any electrical connection.

Advantages
This is a purely non-destructive test for evaluation of concrete structures particularly old
structures. The methods is very fast and gives quite accurate results if the reinforcement is
not heavily congested. The equipment is very light and even one person can perform the
test without any assistance.

Factor affecting  test methods
Cover measurement may be affected by neighboring  bars parallel to the bras being
measured.
Magnetic effects from the aggregate and matrix of the concrete.
Variation in the properties of steel.
Cross sectional shape of bars.
Roughness of surface .





Monday, December 8, 2014
Posted by Saurabh Gupta

Objective Solving Tricks for GATE exam

Objective Solving Tricks 

Most of time students complain that they couldn’t complete their objective paper; they were struck in one or another problem and wasted a lot of time. Some says that their guess went wrong and marks were deducted due to negative marking, some could not read paper completely and missed some easy questions etc.
I’ll like to stress that objective paper solving is different from subjective paper. You don’t need to study extra for objective questions but practice little bit.
Your guess in solving objective can bring you in difficulty but some intelligent/educated guesscan add valuable marks to your score. Most of time objective questions have some hint in the form of multiple choices for the question. 
Following can be used as guidelines for solving objective paper:

General Tips
   Keep the structure of GATE in mind(25 Quest 1 Mark each, 30 Quest. 2 Marks each with 4 common data questions and 4 Linked Questions).
   Plan your time. Allow more time for high point value questions; reserve time at the end to review your work, and for emergencies. I'll suggest following sequence, but you can keep as per your choice: 2 Marks question, Common Data Questions, Linked questions and then single mark questions.
   Look the whole test over, skimming the quesitons and developing a general plan for your work. If any immediate thoughts come to you, jot them down in the margin 
   Start with the section of the test that will yield the most points, but begin working with the easiest questions to gain time for the more difficult ones and to warm up. 
   Work quickly, check your timing regularly, and adjust your speed when necessary.
   Avoid reading into the questions. When you find yourself thinking along the lines of "this is too easy; there must be a trick..." mark the question and move on to another.  Interpret questions literally. 
   Mark key words in every question. To help find the key words, ask yourself WHAT, WHO, WHERE, WHEN, and HOW? 

Multiple Choice Specific Tips
   Remember in GATE each question will have four choices for the answer, only one is correct and wrong answer carry 33% negative marks
   Read the question (without reading choices) very carefully.
   Mark important key words and look for special key words like not, but, except , or, nor, always, never, and only .

Thursday, November 20, 2014
Posted by Saurabh Gupta
Tag :

[NOTES] Concrete Pavement Joints

Concrete Pavement Joints


  1. Purpose
  2. Background
  3. Transverse Contraction Joints
  4. Longitudinal Joints
  5. Construction Joints
  6. Expansion Joints
  7. Joint Construction
  1. PURPOSE. To provide guidance and recommendations relating to the design and construction of joints in jointed Portland cement concrete pavements.
  2. BACKGROUND
    1. The performance of concrete pavements depends to a large extent upon the satisfactory performance of the joints. Most jointed concrete pavement failures can be attributed to failures at the joint, as opposed to inadequate structural capacity. Distresses that may result from joint failure include faulting, pumping, spalling, corner breaks, blowups, and mid-panel cracking. Characteristics that contribute to satisfactory joint performance, such as adequate load transfer and proper concrete consolidation, have been identified through research and field experience. The incorporation of these characteristics into the design, construction, and maintenance of concrete pavements should result in joints capable of performing satisfactorily over the life of the pavement. Regardless of the joint sealant material used, periodic resealing will be required to ensure satisfactory joint performance throughout the life of the pavement. Satisfactory joint performance also depends on appropriate pavement design standards, quality construction materials, and good construction and maintenance procedures.
    2. The most common types of pavement joints, which are defined by their function, are as follows
(1) Transverse Contraction Joint - a sawed, formed, or tooled groove in a concrete slab that creates a weakened vertical plane. It regulates the location of the cracking caused by dimensional changes in the slab, and is by far the most common type of joint in concrete pavements.

(2) Longitudinal Joint - a joint between two slabs which allows slab warping without appreciable separation or cracking of the slabs.

(3) Construction Joint - a joint between slabs that results when concrete is placed at different times. This type of joint can be further broken down into transverse and longitudinal joints.

(4) Expansion Joint - a joint placed at a specific location to allow the pavement to expand without damaging adjacent structures or the pavement itself.

TRANSVERSE CONTRACTION JOINTS. The primary purpose of transverse contraction joints is to control the cracking that results from the tensile and bending stresses in concrete slabs caused by the cement hydration process, traffic loadings, and the environment. Because these joints are so numerous, their performance significantly impacts pavement performance. A distressed joint typically exhibits faulting and/or spalling. Poor joint performance frequently leads to further distresses such as corner breaks, blowups, and mid-panel cracks. Such cracks may themselves begin to function as joints and develop similar distresses. The performance of transverse contraction joints is related to three major factors:

Joint Spacing. Joint spacing varies throughout the country because of considerations of initial costs, type of slab (reinforced or plain), type of load transfer, and local conditions. Design considerations should include: the effect of longitudinal slab movement on sealant and load transfer performance; the maximum slab length which will not develop transverse cracks in a plain concrete pavement; the amount of cracking which can be tolerated in a jointed reinforced concrete pavement; and the use of random joint spacings.

(1) The amount of longitudinal slab movement that a joint experiences is primarily a function of joint spacing and temperature changes. Expansion characteristics of the aggregates used in the concrete and the friction between the bottom of the slab and the base also have an effect on slab movement.

        • (a) Joint movement can be estimated by the following equation:
          Formula 1
          where:
          Delta L = the expected change in slab length, in inches.
          C = the base/slab frictional restraint factor (0. 65 for stabilized bases, 0. 8 for granular bases).
          L = the slab length, in inches.
          Omega = the PCC coefficient of thermal expansion (see Table 1 for typical values).
          Delta T = the maximum temperature range (generally the temperature of the concrete at the time of placement minus the average daily minimum temperature in January, in °F) .
          Epsilon = the shrinkage coefficient of concrete (see Table 2 for typical values). This factor should be omitted on rehabilitation projects, as shrinkage is no longer a factor.
          Table 1
          Typical Values for PCC Coefficient of Thermal Expansion (Omega) [1]
          Type of Coarse AggregatePCC Coeff. of Thermal Expansion (10-6/°F)
          Quartz6.6
          Sandstone6.5
          Gravel6.0
          Granite5.3
          Basalt4.8
          Limestone3.8
        • (b) While the above equation can be used to estimate anticipated joint movements, it may be worthwhile to physically measure joint movements in existing pavements. These measurements could provide the designer with more realistic design inputs.
          Table 2
          Typical Values for PCC Coefficient of
          Shrinkage (Omega) [1]
          Indirect Tensile Strength (psi)PCC Coeff. of Shrinkage (in. /in. )
          300 (or less)0.0008
          4000.0006
          5000.00045
          6000.0003
          700 (or greater)0.0002
(2) For plain concrete slabs, a maximum joint spacing of 15 feet is recommended. Longer slabs frequently develop transverse cracks. It is recognized that in certain areas, joint spacings greater than 15 feet have performed satisfactorily. The importance of taking local experience into account when selecting joint spacing (and designing pavements in general) cannot be overstated. Studies have shown that pavement thickness, base stiffness, and climate also affect the maximum anticipated joint spacing beyond which transverse cracking can be expected. Research indicates that there is a general relationship between the ratio of slab length (L) to the radius of relative stiffness (L) and the amount of transverse cracking [2]. This research shows that there is an increase in transverse cracking when the ratio L/L exceeds 5. 0. Further discussion is provided in Attachment 1.

(3) For reinforced concrete slabs, a maximum joint spacing of 30 feet is recommended. Longer slab lengths have a greater tendency to develop working mid-panel cracks caused by the rupture of the steel reinforcement. Studies have also shown that, as the joint spacing increases above 30 feet, the rate of faulting increases and joint sealant performance decreases [4].

(4) Random joint spacings have been successfully used in plain undoweled pavements to minimize resonant vehicle responses. When using random joint spacings, the longest slab should be no greater than 15 feet, to reduce the potential for transverse cracking. Some States are successfully using a spacing of 12'-15'-13'-14'. Large differences in slab lengths should be avoided.

(5) While they do not affect joint spacing, skewed joints have been used in plain pavements to provide a smoother ride. A skew of 2 feet in 12 feet is recommended, with the skew placed so that the inside wheel crosses the joint ahead of the outside wheel. Only one wheel crosses the joint at a time, which minimizes vehicle response and decreases stresses within the slab. Skewed joints are most commonly used when load transfer devices are not present. While skewed joints may be used in conjunction with load transfer devices, studies have not substantiated that skewing doweled joints improves pavement performance and are not recommended. Dowels in skewed joints must be placed parallel to the roadway and not perpendicular to the joints.

Load Transfer Across the Joint. Loads applied by traffic must be effectively transferred from one slab to the next in order to minimize vertical deflections at the joint. Reduced deflections decrease the potential for pumping of the base/subbase material and faulting. The two principal methods used to develop load transfer across a joint are: aggregate interlock; and load transfer devices, such as dowel bars. It is recommended that dowel bars be used.

(1) Aggregate Interlock. Aggregate interlock is achieved through shearing friction at the irregular faces of the crack that forms beneath the saw cut. Climate, and aggregate hardness have an impact on load transfer efficiency. It can be improved by using aggregate that is large, angular, and durable. Stabilized bases have also been shown to improve load transfer efficiency [14]. However, the efficiency of aggregate interlock decreases rapidly with increased crack width and the frequent application of heavy loads to the point that pavement performance may be affected. Therefore, it is recommended that aggregate interlock for load transfer be considered only on local roads and streets which carry a low volume of heavy trucks.

(2) Dowel Bars. Dowel bars should be used on all routes carrying more than a low volume of heavy trucks. The purpose of dowels is to transfer loads across a joint without restricting joint movement due to thermal contraction and expansion of the concrete. Studies have shown that larger dowels are more effective in transferring loads and in reducing faulting. It is recommended that the minimum dowel diameter be D/8, where D is the thickness of the pavement. However, the dowel diameter should not be less than 1 1/4 inches. It is also recommended that 18-inch long dowels be used at 12-inch spacings. Dowels should be placed mid-depth in the slab. Dowels should be corrosion-resistant to prevent dowel seizure, which causes the joint to lock up. Epoxy-coated and stainless steel dowels have been shown to adequately prevent corrosion.

Joint Shape and Sealant Properties

(1) The purpose of a joint sealant is to deter the entry of water and incompressible material into the joint and the pavement structure. It is recognized that it is not possible to construct and maintain a watertight joint. However, the sealant should be capable of minimizing the amount of water that enters the pavement structure, thus reducing moisture-related distresses such as pumping and faulting. Incompressibles should be kept out of the joint. These incompressibles prevent the joint from closing normally during slab expansion and lead to spalling and blowups.

(2) Sealant behavior has a significant influence on joint performance. High-type sealant materials, such as silicone and preformed compression seals, are recommended for sealing all contraction, longitudinal, and construction joints. While these materials are more expensive, they provide a better seal and a longer service life. Careful attention should be given to the manufacturer's recommended installation procedures. Joint preparation and sealant installation are very important to the successful performance of the joint. It is therefore strongly recommended that particular attention be given to both the construction of the joint and installation of the sealant material.

(3) When using silicone sealants, a minimum shape factor (ratio of sealant depth to width) of 1:2 is recommended. The maximum shape factor should not exceed 1:1. For best results, the minimum width of the sealant should be 3/8 inch. The surface of the sealant should be recessed 1/4 to 3/8 inch below the pavement surface to prevent abrasion caused by traffic. The use of a backer rod is necessary to provide the proper shape factor and to prevent the sealant from bonding to the bottom of the joint reservoir. This backer rod should be a closed-cell polyurethane foam rod having a diameter approximately 25 percent greater than the width of the joint to ensure a tight fit.

(4) When using preformed compression seals, the joint should be designed so that the seal will be in 20 to 50 percent compression at all times. The surface of the seal should be recessed 1/8 to 3/8 inch to protect it from traffic. Additional information can be obtained from FHWA Technical Paper 89-04, "Preformed Compression Seals" [5] for PCC pavement joints. "

LONGITUDINAL JOINTS
  1. Longitudinal joints are used to relieve warping stresses and are generally needed when slab widths exceed 15 feet. Widths up to and including 15 feet have performed satisfactorily without a longitudinal joint, although there is the possibility of some longitudinal cracking. Longitudinal joints should coincide with pavement lane lines whenever possible, to improve traffic operations. The paint stripe on widened lanes should be at 12 feet and the use of a rumble strip on the widened section is recommended.
  2. Load transfer at longitudinal joints is achieved through aggregate interlock. Longitudinal joints should be tied with tiebars to prevent lane separation and/or faulting. The tiebars should be mechanically inserted and placed at mid-depth. When using Grade 40 steel, 5/8-inch by 30-inch or 1/2-inch by 24-inch tiebars should be used. When using Grade 60 steel, 5/8-inch by 40-inch or 1/2-inch by 32-inch tiebars should be used. These lengths are necessary to develop the allowable working strength of the tiebar. Tiebar spacing will vary with the thickness of the pavement and the distance from the joint to the nearest free edge. Recommended tiebar spacings are provided in Table 3.
  3. Table 3 Maximum Recommended Tiebar Spacings
    Table 3-Maximum Recommended Tiebar Spacings
      1. Tiebars should not be placed within 15 inches of transverse joints. When using tiebars longer than 32 inches with skewed joints, tiebars should not be placed within 18 inches of the transverse joints.
      2. The use of corrosion-resistant tiebars is recommended, as corrosion can reduce the structural adequacy of tiebars.
      3. It is recommended that longitudinal joints be sawed and sealed to deter the infiltration of surface water into the pavement structure. A 3/8-inch wide by 1-inch deep sealant reservoir should be sufficient.
CONSTRUCTION JOINTS
Transverse Construction Joints

(1) Transverse construction joints should normally replace a planned contraction joint. However, they should not be skewed, as satisfactory concrete placement and consolidation are difficult to obtain. Transverse construction joints should be doweled as described in paragraph 4b(2) and butted, as opposed to keyed. Keyed transverse joints tend to spall and are not recommended.

(2) It is recommended that transverse construction joints be sawed and sealed. The reservoir dimensions should be the same as those used for the transverse contraction joints.

Longitudinal Construction Joints

(1) The decision to use keyed longitudinal construction joints should be given careful consideration. The top of the slab above the keyway frequently fails in shear. For this reason, it is recommended that keyways not be used when the pavement thickness is less than 10 inches. In these cases, the tiebars should be designed to carry the load transfer.

2) When the pavement thickness is 10 inches or more, a keyway may be used to provide the necessary load transfer. If a keyway is to be used, the recommended dimensions are shown in Figure 1. Keyways larger than the one shown may reduce the concrete shear strength at the joint and result in joint failures. The keyway should be located at mid-depth of the slab to ensure maximum strength. Tiebars are necessary when using keyways. Consideration should be given to deleting the keyway and increasing the size and/or number of tiebars. The additional steel cost may be more than offset by the potential savings in initial labor and future maintenance costs.
  1. Figure 1 Recommended Keyway Dimensions
    Figure 1-Recommended Keyway Dimensions (Diagram)
  2. (3) Tiebars should not be placed within 15 inches of transverse joints. When using tiebars longer than 32 inches with skewed joints, tiebars should not be placed within 18 inches of the transverse joints.
  3. (4) It is essential that the tiebars be firmly anchored in the concrete. Tiebars should be either mechanically inserted into the plastic concrete or installed as a two-part threaded tiebar and splice coupler system. It is recommended that periodic pullout tests be conducted to ensure the tiebars are securely anchored in the concrete. Attachment 2 describes a recommended testing procedure for tiebars.
  4. (5) Bending of tiebars is not encouraged. Where bending of the tiebars would be necessary, it is recommended that a two-part threaded tiebar and splice coupler system be used in lieu of tiebars. If tiebars must be bent and later straightened during construction, Grade 40 steel should be used, as it better tolerates the bending. It may be necessary to reapply a corrosion-resistant coating to the tiebars after they have been straightened. When pullout tests are performed, they should be conducted after the tiebars have been straightened.
  5. (6) It is recommended that longitudinal construction joints be sawed and sealed. The reservoir dimensions should be the same as those used for the longitudinal joints.

EXPANSION JOINTS
  1. Good design and maintenance of contraction joints have virtually eliminated the need for expansion joints, except at fixed objects such as structures. When expansion joints are used, the pavement moves to close the unrestrained expansion joint over a period of a few years. As this happens, several of the adjoining contraction joints may open, effectively destroying their seals and aggregate interlock.
  2. The width of an expansion joint is typically 3/4 inch or more. Filler material is commonly placed 3/4 to 1 inch below the slab surface to allow space for sealing material. Smooth dowels are the most widely used method of transferring load across expansion joints. Expansion joint dowels are specially fabricated with a cap on one end of each dowel that creates a void in the slab to accommodate the dowel as the adjacent slab closes the expansion joint, as shown in Figure 2.
    Figure 2 Expansion Joint Detail
    Figure 2-Expansion Joint Detail (Diagram)
  3. Pressure relief joints are intended to serve the same purpose as expansion joints, except that they are installed after initial construction to relieve pressure against structures and to alleviate potential pavement blowups. Pressure relief joints are not recommended for routine installations. However, they may be appropriate to relieve imminent structure damage or under conditions where excessive compressive stresses exist. Additional information can be obtained from the FHWA Pavement Rehabilitation Manual, Chapter 9.
7 . JOINT CONSTRUCTION

  1. Concrete Placement
(1) A prepaving conference should be considered on all major paving projects. This conference should include the project engineer and the paving contractor and should discuss methods for accomplishing all phases of the paving operation. The need for attention to detail cannot be overstated.

    (2) When using dowel baskets, the baskets should be checked prior to placing the concrete to ensure that the dowels are properly aligned and that the dowel basket is securely anchored in the base. It is recommended that dowel baskets be secured to the base with steel stakes having a minimum diameter of 0. 3 inch. These stakes should be embedded into the base a minimum depth of 4 inches for stabilized dense bases, 6 inches for treated permeable bases, and 10 inches for untreated permeable bases, aggregate bases, or natural subgrade. A minimum of 8 stakes per basket is recommended. All temporary spacer wires extending across the joint should be removed from the basket. Securing the steel stakes to the top of the dowel basket, as opposed to the bottom, should stabilize the dowel basket once these spacer wires are removed.

      (3) Dowels should be lightly coated with grease or other substance over their entire length to prevent bonding of the dowel to the concrete. This coating may be eliminated in the vicinity of the welded end if the dowel is to be coated prior to being welded to the basket. The traditional practice of coating only one-half of the dowel has frequently resulted in problems, primarily caused by insufficient greasing and/or dowel misalignment. The dowel must be free to slide in the concrete so that the two pavement slabs move independently, thus preventing excessive pavement stresses. Only a thin coating should be used, as a thick coating may result in large voids in the concrete around the dowels.

        (4) The placement of concrete at construction joints is particularly critical. Therefore, care must be taken to ensure that only quality concrete is used in their construction; i. e. , do not use the first concrete down the chute, nor the "roll" from the screed to construct this type of joint. The concrete used to construct these joints should be the same as for the remainder of the slab. The practice of modifying the mix at the joints is not recommended.

          (5) Careful and sufficient consolidation of the concrete in the area of the joints is essential to good joint performance. Load transfer across a doweled joint is greatly affected by the quality of concrete consolidation around the dowels. Consolidation also has a direct relationship to concrete strength and durability. Concrete strength, in turn, has a significant effect on the amount of spalling that occurs at the joint.

            (6) The placement of dowels should be carefully verified soon after paving begins. If specified tolerances are not being achieved, then an evaluation of the dowel installation, concrete mix design, and placement techniques must be made. Appropriate corrections should be made to the paving process to ensure proper alignment of the load transfer devices.

              (7) When paving full-depth full-width, a mechanical prespreader and finishing machine in the paving train can be used to reduce drag and shear forces on the dowels.

                (8) In cases where separate concrete placement is made adjacent to previously placed concrete, i. e. , truck climbing lanes or concrete shoulders being placed after mainline pavement, it is important that incompressibles do not enter the previously sawed transverse joint reservoir or crack that typically forms below the transverse joint reservoir. It is recommended that backer rod, tape, or other material be placed on the vertical face of the transverse joint at the edge of the pavement to prevent mortar from intruding into the existing joint. Failure to keep incompressibles out could prevent the joint from closing normally during slab expansion and may lead to delaminations near the edge of the previously placed concrete.

                Sawing
                  (1) It is recommended that all joints be sawed. The sawing of transverse contraction and longitudinal joints should be a two-phase operation. The initial sawing is intended to cause the pavement to crack at the intended joint. It should be made to the required depth, as described later, with a 1/8-inch wide blade. The second sawing provides the necessary shape factor for the sealant material. This second sawcut can be made any time prior to the sealant installation. However, the later the sealant reservoir is made, the better the condition of the joint face. Both sawcuts should be periodically checked to ensure proper depth, as saw blades tend to wear, as well as ride up when hard aggregate is encountered. Periodic measurement of blade diameter is an excellent method to monitor random blade wear, particularly when using gang saws.

                    (2) Time of initial sawing, both in the transverse and longitudinal directions, is critical in preventing uncontrolled shrinkage cracking. It is very important that sawing begin as soon as the concrete is strong enough to both support the sawing equipment and to prevent raveling during the sawing operation. All joints should be sawed within 12 hours of concrete placement. The sawing of concrete constructed on stabilized base must be sawed earlier. This is particularly critical during hot weather. Once sawing begins, it should be a continuous operation and should only be stopped if raveling begins to occur.

                      (3) For transverse contraction joints, an initial sawcut of D/3 is recommended, particularly for pavements with a thickness greater than 10 inches. In no case should the sawcut depth be less than D/4. Transverse contraction joints should be initially sawed in succession. Skip sawing is not recommended, as this practice results in a wide range of crack widths that form beneath the sawed joints. These varied crack widths affect the shape factors and may cause excessive sealant stresses in those joints initially sawed. The dimensions of the final sawing should be dependent upon the sealant type and the anticipated longitudinal slab movement.

                        (4) For longitudinal joints, a minimum initial sawcut depth of D/3 is recommended to ensure cracking at the joint. The maximum sawcut depth should be such that the tiebars are not damaged. A final sawing that provides a 3/8-inch wide by 1-inch deep sealant reservoir should be sufficient.

                          (5) When a lengthy period is anticipated between the initial sawing of the joint and the final sawing and sealing, consideration should be given to filling the joint with a temporary filler. This filler material should keep incompressibles out of the joint and reduce the potential for spalling.

                            (6) The use of plastic inserts is not recommended. Although a few States have had success with these inserts, most States no longer allow their use. Improper placement of plastic inserts has been identified as a cause of random longitudinal cracking [2]. It is also very difficult to seal the joint formed by these inserts.

                            DESIGN OF SLAB LENGTH
                            Studies have shown that pavement thickness, base stiffness, and climate affect the maximum anticipated joint spacing beyond which transverse cracking can be expected [2]. Research indicates that there is a general relationship between the ratio of slab length (L) to the radius of relative stiffness (_) and transverse cracking. The radius of relative stiffness is a term defined by Westergaard to quantify the relationship between the stiffness of the foundation and the flexural stiffness of the slab. The radius of relative stiffness has a lineal dimension and is determined by the following equation:
                            L = [Eh3/12k(1-µ2) ]0. 25
                            where
                            • L = radius of relative stiffness (in. )
                            • E = concrete modulus of elasticity (psi.)
                            • h = pavement thickness (in. )
                            • µ = Poisson's ratio of the pavement
                            • k = modulus of subgrade reaction (pci.)
                            Research data indicates that there is an increase in transverse cracking when the ratio L/L exceeds 5. 0. Using the criteria of a maximum L/L ratio of 5. 0, the allowable joint spacing would increase with increased slab thickness, but decrease with increased (stiffer) foundation support conditions. The relationship between slab length, slab thickness, and foundation support for a L/L ratio of 5. 0 is shown below.
                            Attachment 1: Design of Slab Length
                            Attachment 1: Design of Slab Length (Chart)
                            TIEBAR PULLOUT TESTS
                            Proper consolidation of the concrete around the tiebars is essential to the performance of longitudinal construction joints. Adjacent lanes should not be constructed until the project engineer has had opportunity to test the pullout resistance of the tiebars. Acceptance of the tiebars should be based on the results of the tests for resistance to pullout. The project engineer will select 15 tiebars from the first day's placement, after the concrete has attained a flexural strength of 550 psi. The tiebars will be tested to 12,000 lbs. or to a slippage of 1/32 inch, whichever occurs first. The average of the results of these pullout tests, divided by the spacing of the tiebars, will be used to determine the pullout resistance in lbs. per linear foot.
                            If the test results on the first day's placement are well within the test requirements shown below, additional testing will be at the discretion of the project engineer and will be based on comparison of the installation methods and spacings of the first day's placement with subsequent placements.
                            If the results of the pullout tests are less than the minimum requirements specified for the width of concrete being tied, the contractor shall install additional tiebars to provide the minimum average pullout resistance required, as directed by the project engineer. Testing of the supplemental tiebars will be at the discretion of the Engineer.
                            Tiebars shall be installed by methods and procedures such that the tiebars will develop the minimum average pullout resistance specified without any slippage exceeding 1/32 inch in accordance with the following table:
                            Tied Width of Pavement (Distance from Joint Being Constructed to Nearest Free Edge)Average Pullout Resistance of Tiebars, lbs. /L. F. of joint, minimum.
                            12 feet or less2200
                            Over 12 feet to 17 feet3200
                            Over 17 feet to 24 feet4500
                            Over 24 feet to 28 feet5200
                            Over 28 feet to 36 feet6800
                            Over 36 feet9000
                            REFERENCES
                            1. "AASHTO Guide for Design of Pavement Structures 1986," American Association of State Highway and Transportation Officials, 1986.
                            2. "Performance of Jointed Concrete Pavements, Volume I, Evaluation of Concrete Pavement Performance and Design Features," Federal Highway Administration, FHWA-RD-89-136, K. D. Smith, D. G. Peshkin, M. I. Darter, A. L. Mueller, and S. H. Carpenter, March 1990.
                            3. Kelly, E. F. , "Application of the Results of Research to the Structural Design of Concrete Pavements," Public Roads, Volume 20, No. 6, August 1939.
                            4. "Portland Cement Concrete Pavement Evaluation System (COPES) ," M. I. Darter, J. M. Becker, M. B. Snyder, and
                            R. E. Smith, National Cooperative Highway Research Program Report 277, Transportation Research Board, 1985.
                            5. "Preformed Compression Seals," Federal Highway Administration, Pavement Division Technical Paper 89-04, 1989.
                            6. "Pavement Rehabilitation Manual," Chapter 9 - Pressure Relief in Concrete Pavement, Federal Highway Administration, FHWA-ED-88-025, 1988.
                            7. "1984 Standard Specifications for Construction," Michigan Department of Transportation, 1984.
                            8. "Design of Zero-Maintenance Plain Jointed Concrete Pavement," Federal Highway Administration, FHWA-RD-77-111, Vol. 1, M. I. Darter, 1977.
                            9. "Design, Construction, and Maintenance of PCC Pavement Joints," National Cooperative Highway Research Program, Synthesis of Highway Practice No. 19, Transportation Research Board, 1973.
                            10. "Concrete Pavement Construction - Inspection at the Paving Site, Portland Cement Association, EB085. 01P, 1980.
                            11. "Rigid Pavement Analysis and Design," Federal Highway Administration, FHWA-RD-88-068, K. W. Heinrichs, M. J. Liu, M. I. Darter, S. H. Carpenter, and A. M. Ioannides, 1989.
                            12. "Relationship of Consolidation to Performance of Concrete Pavements," FHWA-RD-87-095, D. A. Whiting and S. D. Tayabji, 1987.
                            13. "The Design of Plain Doweled Jointed Concrete Pavement,"
                            K. Kelleher and R. M. Larson, 4th International Conference on Concrete Pavement Design and Rehabilitation, 1989.
                            14. "Joint Design for Concrete Highway and Street Pavements," Portland Cement Association, IS059. 03P, 1980.
                            15. "The Benefits of Using Dowel Bars," Federal Highway Administration, Pavement Division Technical Paper 89-03, 1989.
                            16. "Performance of Jointed Concrete Pavements, Volume III, Summary of Findings," K. D. Smith, D. G. Peshkin, M. I. Darter, and A. L. Mueller, Federal Highway Administration, FHWA-RD-89-138, November 1990.
                            Updated: 04/07/2011

                            Monday, November 3, 2014
                            Posted by Saurabh Gupta

                            Telegram

                            Notes for M.Tech. CTM (Construction Technology Management) available strictly as per syllabus for all three-semester available. Features: • Notes from Gold Medalist student • Handwritten crisp to the point notes • Printed notes • Video notes of some subjects • Previous year question paper • Solved question paper • Subject/Unit wise arranged • Objective question paper for online exam M.Tech. complete thesis support also available. Join telegram group https://t.me/+cj3WhHbC86syMTdl Complete Mtech Thesis support available: 1) Synopsis 2) Synopsis PPT 3) Thesis 4) Thesis PPT 5) Conference paper These are included in the package Those who only want guidance, msg me for more information https://t.me/+cj3WhHbC86syMTdl
                            Related Posts Plugin for WordPress, Blogger...

                            Popular Post

                            Blogger templates


                            Copyright @ NotesCivil 2013-2016. Powered by Blogger.

                            Total Pageviews

                            - Copyright © CIVIL Engineering STUDY Material , NOTES , Free Ebook