DUCTILITY OF BITUMEN


                              
To determine the suitability of bitumen for its use in road construction.

APPARATUS:
The apparatus as per IS: 1208-1978 consists of
(i) Briquette mould: It is made of brass. Circular holes are provided at ends called clips to grip the fixed and movable ends of the testing machine. The mould when properly assembled form a briquette specimen of following dimensions.
Total length 75.0 ± 0.5 mm
Distance between clips 30.0 ± 0.3mm
Width at mount of slip 20.0 ± 0.2mm
Width at minimum cross-section
(half way between clips) 10.0 ± 0.1mm
Thickness throughout 10.0 ± 0.1mm
(ii) Water bath: A bath maintained within 27.0° ±0.1 °C of the specified test temperature containing not less than 10 litres of water, the specimen being submerged to a depth of not less than 10 cms and supported on a perforated shell and less than 5 cms from the bottom of the bath.
(iii) Testing machine : For pulling the briquette of bituminous material apart, any apparatus may be used which is so constructed that the specimen will be continuously submerged in water while the two clips are being pulled apart horizontally at a uniform speed of 50 ± 2.5 mm per minute.
(iv) Thermometer. Range 0-44°C and readable up to 0.2°C
THEORY:
The ductility test gives a measure of adhesive property of bitumen and its ability to stretch. In flexible pavement design, it is necessary that binder should form a thin ductile film around aggregates so that physical interlocking of the aggregates is improved. Binder material having insufficient ductility gets cracked when subjected to repeated traffic loads and it provides pervious pavement surface. Ductility of a bituminous material is measured by the distance in centimeters to which it will elongate before breaking when two ends of standard briquette specimen of material are pulled apart at a specified speed and specified temperature.
PROCEDURE:
(i) Melt the bituminous test material completely at a temperature of 75°C to 100° C above the approximate softening point until it becomes thoroughly fluid.
(ii) Strain the fluid through IS sieve 30.
(iii) After stirring the fluid, pour it in the mould assembly and place it on a brass plate. In order to prevent the material under test from sticking, coat the surface of the plate and interior surfaces of the sides of the mould with mercury or by a mixture of equal parts of glycerine and dextrine.
(iv) After about 30-40 minutes, keep the plate assembly along with the sample in a
water bath. Maintain the temperature of the water bath at 27° C for half an hour.
(v) Remove the sample and mould assembly from the water bath and trim the specimen by levelling the surface using a hot knife.
(vi) Replace the mould assembly in water bath for 80 to 90 minutes.
(vii) Remove the sides of the mould.
(viii)Hook the clips carefully on the machine without causing any initial strain.
(ix) Adjust the pointer to read zero.
(x) Start the machine and pull clips horizontally at a speed of 50 mm per minute.
(xi) Note the distance at which the bitumen thread of specimen breaks.
Mean of two observations rounded to nearest whole number is ductility value.
Note: Machine may have a provision to fix two or more moulds so as to test three specimens simultaneously.
PRECAUTIONS:
(i) The plate assembly upon which the mould is placed shall be perfectly flat and level so that the bottom surface of the mould touches it throughout.
(ii) In filling the mould, care should be taken not to distort the briquette and to see that no air pocket is within the moulded sample.

OBSERVATIONS:

 SPECIMEN
  BREAKDOWN POINT (Cm)
1
 50.6
2
51.2
3
53.4
MEAN
 51.73

RESULT:

Ductility value = 53.4 Cm 

INCOMING SEARCHES 
ductility test on bitumen
ductility test for bitumen
bitumen ductility test
ductility of bitumen
ductility of bitumen test
torsion testing machine
fatigue testing machine
bitumen
lab testing equipment
plastic testing equipment
utm machine
testing equipments
plastic testing machine
testing instruments
creep testing machine test on bitumen
tests on bitumen
test of bitumen
bitumen test
test for bitumen
bitumen testing equipment
penetration test for bitumen
float test of bitumen
tests for bitumen
bitumen testing apparatus
bitumen tests
bitumen testing instruments
testing of bitumen
bitumen testing
tests of bitumen
ductility test
ductility testing machine
ductility test apparatus
ductility test procedure
ductility testing
asphalt ductility test
ductility of asphalt test
how to test ductility
ductility of bituminous materials test
ductility test of bitumen procedure
bitumen ductility test procedure
viscosity test of bitumen procedure
bitumen test procedure
bitumen testing procedures
viscosity of bitumen test proceduredesign of pavement
bitumen pavement
pavement material
pavement testing equipment
asphalt pavement design
flexible pavement materials
test pavement
pavement testing
pavement test

Leave a Reply

Subscribe to Posts | Subscribe to Comments

Telegram

Notes for M.Tech. CTM (Construction Technology Management) available strictly as per syllabus for all three-semester available. Features: • Notes from Gold Medalist student • Handwritten crisp to the point notes • Printed notes • Video notes of some subjects • Previous year question paper • Solved question paper • Subject/Unit wise arranged • Objective question paper for online exam M.Tech. complete thesis support also available. Join telegram group https://t.me/+cj3WhHbC86syMTdl Complete Mtech Thesis support available: 1) Synopsis 2) Synopsis PPT 3) Thesis 4) Thesis PPT 5) Conference paper These are included in the package Those who only want guidance, msg me for more information https://t.me/+cj3WhHbC86syMTdl
Related Posts Plugin for WordPress, Blogger...

Popular Post

Blogger templates


Copyright @ NotesCivil 2013-2016. Powered by Blogger.

Total Pageviews

- Copyright © CIVIL Engineering STUDY Material , NOTES , Free Ebook