1. Short notes
a. Arbitration act , need and essential
b. Contracts
c. Features of contract document
d. Contract revision  & claims
e. Disputes in contract
f. Important contract laws
g. Nature of contract
h. Variation in work and conditions
i. Important contract clauses
j. nature of contract
k. negotiated contract , lump sump , Cost plus,  item rate contract & difference B/w them
l. liquated damage
m. termination right
n. letter to indent
o. contract claims
p. Requirement of valid contract
q. Maintenance period
r. Incentive contract
s. Scrutiny of tender
t. Refund of security deposit
u. Yardstick for wages revision
v. Conciliation acts 1996
w. Protection for site and security
x. Item rate tender s
2. Explain the purpose of earnest money, security deposit, retention amount.
3. Explain principle of analysis of rate and specification.
4. What is meant by master plan? Explain with example.
5. Elaborate various laws related to wages and disputes.
6. What is meant by capital structure? Elaborate.
7. What are tender document? State their importance in ease of arbitration proceeding
8. Enumerate the document included in a construction project.
9. Briefly mention the responsibility of the owner , engineer and the contractor
10. Discuss the principles of analysis of rate of different items of building contraction work .
11. Factor affecting analysis of rate
12. Advances techniques of estimation*
13. What is capital? What is capital structure? Its type  and theory of capital formation
14. Contract labor acts 1970 and its provision.
15. Law relating to industrial disputes
16. Indian contract law
17. Technical specification for material and workmanship in a construction project
18. Factor leading to development of disputes, in the execution of construction project? How this disputes can be settled.
19. Required consideration in clause related alteration, addition, omission, extension of time for completion of work.
20. What is breaching of contract?
21. What is difference b/w contract and agreement?
22. Discuss under what condition the bidder can be called for negotiation.
23. What is tender evaluation? Discuss the role of incentives in bid evaluation.
24. What is informal tender with salient features?
25. Arbitration and discuss its legal status of arbitration
26. Discuss the role of inflation in analysis of rate. Explain its by M30 in road work and bridge work.
27. What are the specification that should be placed before a customer for multistoried housing project. Critically analyze each.
\

Leave a Reply

Subscribe to Posts | Subscribe to Comments

Telegram

Notes for M.Tech. CTM (Construction Technology Management) available strictly as per syllabus for all three-semester available. Features: • Notes from Gold Medalist student • Handwritten crisp to the point notes • Printed notes • Video notes of some subjects • Previous year question paper • Solved question paper • Subject/Unit wise arranged • Objective question paper for online exam M.Tech. complete thesis support also available. Join telegram group https://t.me/+cj3WhHbC86syMTdl Complete Mtech Thesis support available: 1) Synopsis 2) Synopsis PPT 3) Thesis 4) Thesis PPT 5) Conference paper These are included in the package Those who only want guidance, msg me for more information https://t.me/+cj3WhHbC86syMTdl
Related Posts Plugin for WordPress, Blogger...

Popular Post

Blogger templates


Copyright @ NotesCivil 2013-2016. Powered by Blogger.

Total Pageviews

- Copyright © CIVIL Engineering STUDY Material , NOTES , Free Ebook